Remove Consulting Remove Contract Remove EJCDC Remove Subcontracting
article thumbnail

Specifications for design-build projects

Construction Specifier

The contractor is required to build the project in complete compliance with the drawings, specifications, and other contract documents (Figure 1). In design-build, the owner typically enters into a single prime contract with an entity called the design-builder that is responsible for both designing and building the project.

EJCDC 52