Remove Defense Remove Denver Remove Fabrication Remove Renovating
article thumbnail

Construction Cost Estimating, Location Factoring, and National Average Cost Data

Job Order Contracting

The RSMeans city cost index (CCI) and the Department of Defense area cost factor (ACF) index are two primary examples of location factor publications. m (4 inches) thick slab, vapour barrier and welded wire fabric in Baton Rouge, Louisiana, United States, c oncrete was found to be underestimated by 18% and vapour barrier by as much as 67%.

article thumbnail

4BT OpenCost(TM) Local Market Granular Cost Data an RSmeans Alternative?

Job Order Contracting

Significantly improve cost visibility and cost management for ALL your facilities repair, renovation, maintenance, and new build projects. #1 Granular line items for repair, renovation, maintenance, and new builds organized by expanded CSI MasterFormat. 1 Over 85,000 line items available. Million datapoints updated quarterly. #3

article thumbnail

Advanced Manufacturing: Manufacturing Gets Smarter, Faster

Business Facilities

While a wealth of industries and companies are adding advanced manufacturing jobs in Kentucky—including healthcare products and pharmaceutical production, factory robotics systems fabrication and integration, aerospace composites, chemicals engineering and production to name a few—none is growing as fast as aluminum. The firm will spend $6.7