Construction Cost Estimating, Location Factoring, and National Average Cost Data
Job Order Contracting
AUGUST 4, 2023
For example, Estes (2016) found that for a slab-on-grade foundation assembly with 0.1 m (4 inches) thick slab, vapour barrier and welded wire fabric in Baton Rouge, Louisiana, United States, c oncrete was found to be underestimated by 18% and vapour barrier by as much as 67%. Additionally, assembly costs for 0.1 Built Environ.
Let's personalize your content