Remove Design Remove Fabrication Remove Life Cycle Remove Subcontracting
article thumbnail

5 Types of Subcontractor Software Transforming the TradesĀ 

Autodesk Construction Cloud

Subcontracting is a time-honored tradition. However, project management tools diverge in that they focus on project progress, rather than progress along a sub process, like fabrication or installation. That means, when they run into trouble, they can return to the original design intent and see how best to work around the issue.

Software 105
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). Requirements.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). Requirements.

article thumbnail

Job Order Contracting ā€“ Best Practices Implementation

Building Information Management

Best practice Job Order Contracts typically rely upon the Owner’s existing construction design specifications, and the UPB. A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Subcontracts. Specifications.