article thumbnail

The Next Generation in Construction: A Spotlight on 6 Young Industry Innovators  

Autodesk Construction Cloud

I believe that this scholarship has given me a huge step into the computer drafting and design field. Michael Hidalgo of Florida, Freshman, Miami Dade College, Florida . I wanted this project to be feasible and creating a completely self-sustaining home out of a 20’ x 8’ x 9’6” container without spending too much money was difficult.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

The SC General Assembly has set aside $300 million to cover the project’s entire construction cost, if needed, and the federal dollars needed to complete the feasibility study have been allocated, meaning that the project is proceeding with no funding or staff resource constraints. MIAMI: A GLOBAL LOGISTICS HUB. Johns River.