Remove Drafting Remove Overhead Remove Permits Remove Subcontracting
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. The NIH facilitators then obtained consensus for each section of the draft RFP.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application. 00 31 46 Permits. 00 31 43 Permit Application. 00 31 46 Permits.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application. 00 31 46 Permits. 00 31 43 Permit Application. 00 31 46 Permits.