Remove 2002 Remove Chicago Remove Fabrication Remove Feasibility
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Value engineering program is commonly carried out in the systematic stages of; feasibility, concept design, design development, construction and operations and occupancy phase of the projects (Table 1). Building in this context involve the building’s fabrics, structure and engineering services. Journal of Infrastructure System , Vol.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

Jindal said the company is examining the feasibility of additional Louisiana projects that would bring the total new capital investment at its sites in the state to $1.2 1000 pound thrust; and Investments into new local capabilities including design, fabrication, and remote hot fire test capabilities for “Green” propulsion systems.

Metro 110