article thumbnail

constructionattorneyblog: Subcontractor's Mechanics lien allowed.

Construction Lawyer

The owner had hired a general contractor who, in turn, had subcontracted some of the work. After the owner paid the fifth draw and the general deposited the funds into its bank account, the bank seized the funds in the account because of another debt owed by the general. See 770 ILCS 60/21.02 (West 2004). University of St.

Lien 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or.