Construction Equation: Knowledge Problems + Data Problems + Management Problems = Outcome Problems

Job Order Contracting

Lack of recognition by senior management of the linkage between between the built environment and organizational mission Low level of understanding of both life-cycle total-cost-of-ownership management and integrated lean planning, procurement, and project delivery principles and processes. Procurement of built assets.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

A credible construction cost estimate is required prior to engaging in procurement. Typical construction project stake holders include: Owners (management, engineering, contracting/procurement, building users), Contractors, Subcontractors, and Designers/Architects. Primary data sources should be used whenever possible.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges.

article thumbnail

Lean methodology is ignored by the construction sector

Job Order Contracting

While there has been a fair amount written about Lean principles, actual application in the form of an integrated construction planning, procurement, and project delivery methodology has been limited to 5% or less actual work. Influence of project type and procurement method on rework costs in building construction projects.

article thumbnail

Public Sector Real Property Management – Quality Construction Cost Estimating – Earned Value Management

Building Information Management

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

Schedule LOD’s – Levels of Detail for Construction Schedules

Building Information Management

This schedule level may represent summary activities of an execution stage, specifically engineering, procurement, construction and start-up activities. Level 2 schedules are generally prepared to communicate the integration of work throughout the life cycle of a project. Typically represented in Gantt format.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. Procurement Requirements and Contracting Requirements. 1995 Edition.