Public Procurement of Construction Services
Job Order Contracting
MARCH 28, 2024
References: AIA (2007). References: AIA (2007). Integrated Project Delivery: A Guide.” The American Institute of Architects (AIA), Washington, DC AGC (2010). Collaboration, Integrated Information and the Project Lifecycle in Building Design, Construction and Operation.” Construction Users Roundtable (CURT). Ballard, G., and Cho, S. and Dossick, C.
Let's personalize your content