article thumbnail

Building Hong Kong's Airport

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 kmĀ² platform.

Airports 203
article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. The problem areas, effects in foundation and defects in structure due to those causes are presented here. There can be many causes for these defects.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Rubble Stone Soling: The rubble stone generally used are of best variety of black trap / granite / basalt or other variety of stone available locally.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii)

article thumbnail

Subways in America

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. RECOMMENDED FOR YOU Building Hong Kong’s Airport Close All rights reserved.

America 203
article thumbnail

TYPES OF PRECAST COMPONENTS IN A BUILDING

The Constructor

Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Reply Alaa Ragab Posted on 18/04/2012 at 06:37 thanks for your efforts.

Concrete 240
article thumbnail

WHY WE TEST CONCRETE SRTRENGTH AFTER 28 DAYS?

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Reply Pak Nixk Posted on 29/03/2012 at 04:36 bagus…utk infomasi kita semua. Reply Hemen Thakuria Posted on 06/04/2012 at 09:45 what if the cube set failed in test?

Concrete 250