Remove 2013 Remove Railroad Remove Schedule Remove Union
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

From the July/August 2013 issue . The office building is scheduled for completion by spring 2015 with the residential complex following in the summer. After a couple of years of neck-and-neck finishes, China has surged ahead of the United States in Business Facilities’ 2013 global ranking for Renewable Energy Investment Leaders.

Metro 110
article thumbnail

Logistics: On the Road, Water or Rails…or in the Air — AGAIN

Business Facilities

trillion dollars on logistics in 2013, a 2.3 percent in 2013 and 8.3 Freight shipment volumes started 2014 at or below 2013 levels, rose through the spring, dropped al little during summer, peaked during August and September, and finally fell close to where they started at the beginning of the year. According to SoL, U.S.

Roads 41
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Tom Lyerla, the standard bearer

The Korte Company

A precedent for career goals had already been set in Tom’s family: working for the railroad. His father, a railroad engineer for the Cotton Belt Railroad. His grandfathers on both sides, railroad telegraphers. For Tom’s father, “the railroad was his life.” His uncle, a dispatcher for the Illinois Central.

article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

Department of Transportation’s Federal Motor Carrier Safety Administration (FMCSA) Hours of Service (HOS) rule that went into effect on July 1, 2013 could create a reduction in industry productivity, projecting the need for another 100,000 drivers without an increase in shipping volume. Subsequently, the U.S.

article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

Construction officially started on the $600-million facility in April 2013 and aircraft assembly is planned to begin in 2015, with a targeted 2016 delivery of its first A320 jetliner. In late 2013, Gov. The first phase of the terminal is scheduled to open in the 2025-2028 timeframe. According to the U.S.

Metro 111
article thumbnail

LOCATION FOCUS: Texas: Big Heart, Country, Business

Buisness Facilities Contributed Content

The location on I-20, rail served by Union Pacific and Foreign Trade Zone #165 makes Midland a prime location for distribution and manufacturing. The MDC has the ability to structure incentive packages to qualified new and existing employers who create and retain diversified jobs.

Texas 45
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Oil and Gas Service Industry Manufacturing Credit (AS 43.20.049): As part of the More Alaska Production Act passed in 2013, this is a credit of 10% of qualified oil and gas industry service expenditures, up to $10 million per taxpayer per year. Improved accelerated depreciation schedules. For more information, please visit this link.

Income 108