Remove 2016 Remove Fabrication Remove Sewer Remove Site
article thumbnail

Advanced Manufacturing Industry: Dynamic Advancements

Buisness Facilities Contributed Content

By the BF Staff From the March/April 2016 Issue. Oswego County has a highly skilled manufacturing workforce, with welding, fabrication and CNC experience, who are ready to work. Rail service is available throughout the County, with direct access at several sites and industrial parks. Valeo Engine Cooling, Inc.

article thumbnail

Seven Projects Land Deal of the Year Honorable Mentions

Buisness Facilities Contributed Content

By the BF Staff From the January/February 2016 Issue. Under the codename “Project Profile,” KP conducted a wide-ranging site selection search for a new National Innovation Center. Kaiser Permanente (KP) is a leading integrated healthcare provider operating 600 medical offices and 38 hospitals in 8 states. Source: georgia.org).

Deals 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Less Is More In New England

Business Facilities

percent in 2016, was down 0.8 of Labor BLS, noted that New England’s unemployment rate was measurably lower than the national average in 2016—Maine’s unemployment rate was 3.9 percent in December 2016, marking the sixth consecutive month the rate had declined. percent the same time in 2016. percentage points to 4.9

article thumbnail

Heroic Efforts In California

Buisness Facilities Contributed Content

By the BF Staff From the January/February 2016 Issue. Sited along Interstate 15 and U.S. California—two strategically located 200+ acre sites, each controlled by a single entity, as well as 80+ acres of rail-accessible city-owned land. Highway 395, which ultimately joins with I-15 to the south.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. To qualify for either the credit or the exemption, a business must meet detailed requirements concerning site location and employee qualifications.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site and Infrastructure Subgroup: Divisions 30 – 39. Site Survey Information. 01 14 13 Access to Site. 01 14 19 Use of Site. Site Mobilization Meetings. 01 31 23 Project Web Site. Special Project Procedures for Contaminated Sites. 01 43 19 Fabricator Qualifications. 01 74 16 Site Maintenance.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site and Infrastructure Subgroup: Divisions 30 – 39. Site Survey Information. 01 14 13 Access to Site. 01 14 19 Use of Site. Site Mobilization Meetings. 01 31 23 Project Web Site. Special Project Procedures for Contaminated Sites. 01 43 19 Fabricator Qualifications. 01 74 16 Site Maintenance.