Remove Agreement Remove Change Orders Remove Documentation Remove Visualization
article thumbnail

What Is a Change Order?

Autodesk Construction Cloud

What Is a Construction Change Order? According to some estimates, an average of 35% of projects experience at least one major change throughout the life of the project. As a contractor, change orders can leave you feeling like you’re trapped between a rock and a hard place. Key Takeaways.

article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

But a pay app is actually a collection of supporting documents that first and second tier contractors submit to request payment. The construction contract will typically define the process for submitting a pay app, the documents to include, and the deadline for submission. Contractors get paid for the work they document.

Lien 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

4 No-Brainer Workflows with Autodesk Construction Cloud Connect 

Autodesk Construction Cloud

Fortunately, you can overcome these hurdles by using ACC Connect to sync drawings, field reports, and documents in the cloud. And since the information stays in sync, teams know that they can get the documents and information they need in the application they use most. . 2: Project Management. 4: Performance Tracking.

Autodesk 105
article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

As construction evolves, how do you see the role of Director of Design and Construction changing? That includes project management, document management, plan management, cost management, and scheduling. Regarding document management, we've been doing that for a while with PlanGrid and now Autodesk Build.

Design 80
article thumbnail

Some newest construction project management applications for effective construction management

Construction Cost Estimating

This construction application performs in tandem with cameras already set up in the jobsite and provides you visual access to the job ceaselessly. Get crucial visual information long after your project is finished as well as a complete online database of recorded images from your camera system.

article thumbnail

5 Ways to Make Sure Your Data Workflows Meet Business Needs

Autodesk Construction Cloud

In the past, having to share relevant information with stakeholders in a timely manner would have required manual documentation and a more time-consuming process. Share better data visualizations. So, we’ve made access to data visualizations even easier. Standardize your cost documentation.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build).