article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

article thumbnail

Job Order Contracting – The Legal Side

Building Information Management

A highway, road, street, bridge, utility, water supply project, water plant, wastewater plant, water and wastewater distribution or conveyance facility, wharf, dock, airport runway or taxiway, drainage project, or related type of project associated with civil engineering construction; or 2. This policy does not apply to: 1.

Legal 520
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How Autodesk Build Enables EuroAirport to Manage its Assets Digitally

Autodesk Construction Cloud

By using Autodesk Build , an Autodesk Construction Cloud solution, the French-Swiss airport Basel-Mulhouse-Freiburg can now save 360 days of worker hours when planning its equipment maintenance. In an airport, runway maintenance work is carried out at night. Each area is composed of several toilet and sink units.

article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Silver Line Metrorail project leading to the Dulles International Airport. Sometimes, the project won’t pass inspection, or it will need to be torn down due to safety and health concerns. 2: Thoroughly Document Mistakes. If possible, make sure to document the mistake visually with photos.

article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT? All rights reserved.

America 203
article thumbnail

REINFORCEMENT COVER AND PRE-CONCRETE CHECKS

The Constructor

The first part is a visual inspection by the clerk of works or equivalent. The required amount of cover will always be specified on the design drawings, but no time should the cover be less than the maximum size of aggregate plus 5mm.

Concrete 250
article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. km² platform.

Airports 203