Remove Airports Remove Drafting Remove Negotiation Remove Railroad
article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

Sacramento has a prime central location near the San Francisco Bay Area and key distribution channels via an international airport, deep-water channel seaport, and rail and interstate freeway systems. After several months of work, the Draft EIR for the Super Wal-Mart project is now complete and is currently being circulated for review.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

With 32 ports statewide, Louisiana offers six deep-draft ports capable of transferring large quantities of cargo, is one of only two U.S. states with service to all six Class I railroads, and offers more than 7,300 miles of oil pipeline and 11,200 miles of gas pipeline. Already the nation’s No. 2 crude oil producer and No.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport. Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.”

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Special Project Procedures for Airport Facilities. 23 51 13 Draft Control Devices.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Special Project Procedures for Airport Facilities. 23 51 13 Draft Control Devices.