Remove Airports Remove Permits Remove Retail Remove Subcontracting
article thumbnail

Feature Story: 2016 Economic Development Awards

Buisness Facilities Contributed Content

Eleven different Pennsylvania-based construction companies already have been subcontracted to do much of the work, and many more opportunities will be made available as the project goes forward. agriculture, construction, gambling, healthcare and retail). It reimburses 50 percent to 75 percent of employee wages. for the first time.

Indiana 40
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport. Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. The incentive is available for non-retail businesses engaged in commerce for profit that fall into certain categories.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. This credit cannot be carried forward or back, and cannot be used to generate a refund to the taxpayer.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application. 00 31 46 Permits. 00 31 43 Permit Application. 00 31 46 Permits.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application. 00 31 46 Permits. 00 31 43 Permit Application. 00 31 46 Permits.