Remove Airports Remove Reference Remove Subcontracting Remove Transportation
article thumbnail

DBE: How To Grow Your Disadvantaged Business Enterprise The Smart Way

Help Everybody Everyday

But it is important to understand that the concept of DBEs is not just related to transportation projects. Large firms (often referred to as primes) with gigantic government contracts can also struggle with meeting their goals. Another problem is that DBEs often have to subcontract with larger firms. Here’s why.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Internal Revenue Code Credits Adopted by Reference (AS 43.20.021): Under Alaska’s blanket adoption of the IRC, taxpayers can claim all federal incentive credits. In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport. Currently there are two MRZs in Arizona.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

HEALTHY FOREST ENTERPRISE INCENTIVES PROGRAM (HF): Provides incentives for certified businesses that are primarily engaged in harvesting, initial processing or transporting of qualifying forest products. Expand infrastructure connected with existing fleets, public transit and transportation corridors.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).