Remove Architecture Remove DOT Remove Electrical Remove Feasibility
article thumbnail

Behind the Build: Interview with Jon Turner, President and Principal Engineer, Phoenix Civil Engineering

Autodesk Construction Cloud

We also help some of our clients if they need assistance with pre-planning or a feasibility study of their projects. In terms of my career background, I worked for a national consulting firm at the beginning of my career, where we did everything, including architecture, mechanical, civil, electrical, and instrumentation.

Phoenix 52
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). Equipment or transmission lines used directly in producing or transmitting electrical power, but not including distribution. 200,000 megawatt-hours of electricity equals 200 million kWh which, when multiplied by 1ยข per kWh, equals $2 million in credit.)

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). PUBLIC UTILITY TAX REBATES: Tax Credits are available for a rebate of 50 percent of the public utilities tax imposed on new or increased consumption of gas and electricity for five years. The public utilities tax rate is 4.25

Income 75