Remove Banking Remove Drawings Remove Foundation Remove Railroad
article thumbnail

Instructions to Lay Pipe Culverts

Construction Cost Estimating

Pipe culvert, box culvert, and curve culvert are the normal sorts of culverts utilized under roadways and railroads. Excavation : The foundation for pipe culverts will be uncovered to the lines and levels, as appeared in the drawings.

article thumbnail

Tom Lyerla, the standard bearer

The Korte Company

A precedent for career goals had already been set in Tom’s family: working for the railroad. His father, a railroad engineer for the Cotton Belt Railroad. His grandfathers on both sides, railroad telegraphers. For Tom’s father, “the railroad was his life.” I would sit and draw things when I was young.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

COVER STORY: Shovel Ready Sites Are Growing From The Ground Up

Buisness Facilities Contributed Content

Cloud will be our foundation to create an even larger presence across North America as we introduce a significant number of new products which are currently under development,” said Geringhoff CEO Daniel Hansmeier. Since the Shovel Ready Program began in 2009, it has helped to draw projects like Geringhoff and many others to the region.

Site 49
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

CAPCO financing, an alternative to conventional bank financing, can accommodate a slightly higher risk profile and provide a more flexible structure for growing businesses. The COMMERCIAL FISHING AND AGRICULTURE BANK provides loans to fishing, tourism, natural resources and agriculture-based projects.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 01 82 13 Foundation Performance Requirements. 01 33 23 Shop Drawings, Product Data, and Samples. Foundation Commissioning.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 01 82 13 Foundation Performance Requirements. 01 33 23 Shop Drawings, Product Data, and Samples. Foundation Commissioning.