Construction Cost Estimating

Direct Cost includes cost of materials, equipment, labor and subcontracted cost; while the Indirect cost includes overheads and contingency. Besides all of this, every estimate must be prepared with the consideration of other two factors which influence a project namely Direct & Indirect Cost.

article thumbnail

Six Virtual Contractor Bookkeeper Traps

Contractor Bookkeeping

Virtual assistants can be a real asset to any contractor because they have all of the computer hardware, software and office space in their home, which means they can handle a variety of mundane tasks better and faster than most contractors, can and they can do it for a lot less money. Virtual Bookkeeper Trap #2.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FAQ's About Outsourced Contractors Bookkeeping Services

Contractor Bookkeeping

A lot of contractors would like to subcontract out their bookkeeping services and the two main reasons they don''t is fear of losing control and cost. What construction accounting software do you support? Why don''t you support other accounting software? With the same security as Online Banking, your data could not be safer.

FAQ 49
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).