Remove Bankruptcy Remove Equipment Remove Mobility Remove Phoenix
article thumbnail

Modular Builder VBC On the Verge of $25-Million Buy for Katerra Assets

Pro Builder

Volumetric Building Companies (VBC) is in the final stages of a $25-million bankruptcy acquisition of Katerra’s former headquarters in Tracy, Calif. Katerra was founded in 2015 as a startup that brought design, manufacturing, and building construction under one roof, initially in a manufacturing facility in Phoenix, Ariz.,

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Industrial Revenue Bonds: May be used as long-term financing of up to 100% of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g., Pollution control equipment.

Income 108
article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

The expansion includes retrofitting their main fab to logic chips to supply mobile and tablet production. Along with new renovations, Samsung’s Austin Research Center also grew its presence with about 200 engineers dedicated to design and development of the latest technologies for mobile application processors. Samsung Electronics Co.,

Metro 111