LEAN JOC – Job Order Contracting

Job Order Contracting

Work scope is developed and communicated is more detail and more effectively, resulting in the avoidance of traditionally prevalent delays, change orders, and associated skyrocketing costs. The approach invests more resources earlier in the Project life-cycle. Key performance indicators (KPIs). via Four BT, LLC – www.4BT.us

Contract 132
article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Change orders and legals disputes are all but eliminated. For example, BIM technology is not required for either LEAN FM or LEAN project delivery, but is simply a optional tool. For example, BIM technology is not required for either LEAN FM or LEAN project delivery, but is simply a optional tool. The Obstacles.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. The business strategy leading to the integration of previously disparate competencies, business processes, technologies, and teams is the primary goal of a BIM execution plan.

BIM 40
article thumbnail

Integrated project delivery method

Job Order Contracting

An integrated project delivery method is arguably required in order to achieve desired quality, satisfaction, timing, and cost for over 90% of renovation, repair, or new construction projects executed. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

Job Order Contracting – The Premier Industry Solution for Facility Renovation, Repair, Sustainability and Minor New Construction

Building Information Management

Design-bid-build is a problem for everyone! The low-bid system is particularly poor. Contractors are forced to shave their profits to razor-thin margins and gamble on their ability to compensate with change orders and claims on the back end. A lot of that is being driven by technology including BIM.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract).