Remove Bidding Remove Change Orders Remove Fabrication Remove Life Cycle
article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. BIM (Building Information Modeling) is the life-cycle management of the built environment supported by digital technology. As such it serves as a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life cycle from inception onwards.

BIM 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The contractor(s) may submit sample bids and a coefficients (a multiplier(s) to be applied to the referenced unit price book. If off-site time and materials work is required, such as site fabrication, the Owner shall be so notified at the time of the issuance of the TO by the Contractor. Subcontract bid. An Identification (I.D.)