Remove Bidding Remove Denver Remove Fabrication Remove Renovating
article thumbnail

Construction Cost Estimating, Location Factoring, and National Average Cost Data

Job Order Contracting

Unfortunately, the accuracy of program-wide CCIs occasionally led to swings of ±20 percent after projects had gone through the bidding process. m (4 inches) thick slab, vapour barrier and welded wire fabric in Baton Rouge, Louisiana, United States, c oncrete was found to be underestimated by 18% and vapour barrier by as much as 67%.

article thumbnail

4BT OpenCost(TM) Local Market Granular Cost Data an RSmeans Alternative?

Job Order Contracting

Significantly improve cost visibility and cost management for ALL your facilities repair, renovation, maintenance, and new build projects. #1 Granular line items for repair, renovation, maintenance, and new builds organized by expanded CSI MasterFormat. 1 Over 85,000 line items available. Million datapoints updated quarterly. #3

article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

Leveraging BuildingConnected to Enhance Your Digital Bid Process. The preconstruction phase is no stranger to changes with restrictions on in-person bid openings forcing the industry to reevaluate how to conduct bids. Speaker: Ariel Castillo, Strategic Process and VDC Specialist at Miller-Davis Company.