Remove Bidding Remove Overhead Remove Software Remove White Paper
article thumbnail

Job Order Contracting – Lean Construction History

Job Order Contracting

Traditional design-bid-build (DBB) construction delivery was too inefficient for the large numbers of renovation, repair, and sustainment/maintenance projects. is intended to include contractor overhead, profit and any items that reflect the contractor and/or site and/or requirements. Hold a Lessons Learned Workshop at Close Out.

Contract 100
article thumbnail

Job Order Contracting – JOC – Best Management Practices

Building Information Management

There are multiple case studies, white papers, and research documents. Bare costs do not include contractor’s overhead(s) and profit. Estimating JOC projects and/or bidding JOC contracts requires many of the same considerations as a non-JOC situation” Average size projects. Annual volume. Competition. Type of work.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Award determinations are made by selecting the mix of line items to be used for a project and multiplying the mix of line items by the coefficient bid by the offeror. The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes.