article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The “BIM Revolution” fizzled since technology was never the problem. Changing work flows and business relationships, restructuring how organizations interact and are compensated is a requirement. The post Why the BIM Revolution Fizzled appeared first on 4BT.

BIM 100
article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

The errors and poor processes result in change orders, project delays, and legal disputes. The fundamental reason for poor outcomes is the failure to implement and properly manage robust and integrated LEAN planning, procurement, and project delivery processes. are all defined.

Schedule 163
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why is construction so hard?

Fieldwire

We can utilize technology such as Building Information Modeling ( BIM ) to facilitate this design process and to ensure the design aligns with the owners expectations before building commences. Failing to compensate these companies for their expertise only results in them finding ways to get paid later (change orders).

article thumbnail

Job Order Contracting – The Premier Industry Solution for Facility Renovation, Repair, Sustainability and Minor New Construction

Building Information Management

Contractors are forced to shave their profits to razor-thin margins and gamble on their ability to compensate with change orders and claims on the back end. A lot of that is being driven by technology including BIM. As this blog notes—the evolution and integration of JOC with the built environment and BIM is here.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 45 26 Workers Compensation Certificate Schedule. 00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. 00 63 63 Change Order Form. 00 93 57 Record Change Order Requests. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 45 26 Workers Compensation Certificate Schedule. 00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. 00 63 63 Change Order Form. 00 93 57 Record Change Order Requests. Requirements.