Remove BIM Remove Change Orders Remove Estimating Remove ProCore
article thumbnail

AGC Alaska Conference report

Cassell Construction Estimating

Recent developments in BIM, Autonomous Equipment, the Cloud, and Mobile Tools are promising initiatives making a dent in the problem. Paper record-keeping, isolated information silos, and old-school mentality are just a few of the habits holding us back.

Alaska 100
article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

GoBIM : With GOBIM application you can navigate 3D BIM models and their associated data easily as BIM applications are widely used in the construction industry today. Besides, this application includes concrete and excavation formulas that help in estimating the concrete and bricks required.

iPad 45
article thumbnail

Some Best Construction Apps In Recent Times

Construction Cost Estimating

GoBIM This BIM based applications are widely utilized in the construction industry. GOBIM application creates the scope to operate 3D BIM models and their related data on the basis of the factors like number of triangles, number of parameters, and number of materials. For more information, visit this link 7.