Remove BIM Remove Deals Remove Fabrication Remove Life Cycle
article thumbnail

Construction Disruption – BIM, Cloud Computing, and Efficient Project Delivery Methods

Building Information Management

The disruptive digital technologies of building information modeling (BIM) and cloud computing, combined with emergent collaborative construction delivery methods are poised to alter the status quo, ushering in increased levels of collaboration and transparency.

BIM 45
article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. BIM/ BIM EXECUTION PLAN. BIM/ BIM EXECUTION PLAN. The plan describes how BIM will be implemented and which goals will be pursued.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TFM Article – BIM, Cloud Computing, IPD and JOC

Building Information Management

As they pass the emergent stage, BIM and cloud computing will continue to impact project delivery. A disruptive technology is one that alters the very fabric of a business process or way of life, displacing whatever previously stood in its place. Construction Disruption Peter Cholakis.

BIM 40
article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

The future of BIM and project management. The additional infrastructure needs or talent required to be successful in life-cycle data collection & analysis. Go to the session > Speaker: Ivana Tudja, BIM and Digital Engineering Lead (Senior BIM Manager), Mace. *Dates and times are still being confirmed.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 43 19 Fabricator Qualifications. 01 90 00 Life Cycle Activities. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. 05 01 50 Maintenance of Metal Fabrications.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 43 19 Fabricator Qualifications. 01 90 00 Life Cycle Activities. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. 05 01 50 Maintenance of Metal Fabrications.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

During the development of this Program, the question of how to deal with (On the-­?Job-­?Training o O perating, Maintaining and Testing Life Safety. o Total Cost of Ownership (TCO) o Life-­?Cycle Cycle Assessment (LCA). Demonstrate knowledge that the TCO is best determined through Life-­?Cycle Cycle Assessment.