Remove BIM Remove Drawings Remove Negotiation Remove Retail
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

Cory Benjamin , 39, Project Director, BIM Manager, TK Design & Associates, South Lyon, Mich. Project Director, BIM Manager. Horton’s brand and marketing best practices • Opened 11 retail centers within 18 weeks to launch an operating division; trained the sales team and activated outreach to real estate agents to introduce D.R.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Requirements.