Remove BIM Remove Drawings Remove Retail Remove Visualization
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

Cory Benjamin , 39, Project Director, BIM Manager, TK Design & Associates, South Lyon, Mich. Project Director, BIM Manager. Horton’s brand and marketing best practices • Opened 11 retail centers within 18 weeks to launch an operating division; trained the sales team and activated outreach to real estate agents to introduce D.R.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 02 21 16 Measured Drawings. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 02 21 16 Measured Drawings. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Requirements.