article thumbnail

Minimizing Waste and Improving Construction Productivity

Building Information Management

Life-cycle cost vs. first-cost focus. Anecdotally, the main reason BIM has failed to date, and YES is has failed, is the lack of the application of a well defined systems and process approach that incorporates LEAN collaborative construction delivery. BIM is NOT about design. Performance and value-based vs. low-bid.

article thumbnail

5 Types of Subcontractor Software Transforming the Trades 

Autodesk Construction Cloud

Subcontracting is a time-honored tradition. With these tools, you can monitor and track every stage of a project’s life cycle from simple task management to completions, dependencies, and roadblocks in a unified and holistic context. . Today, little is different. 5: Model-Centric Tools.

Software 105
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).