Remove BIM Remove Maine Remove Modeling Remove Negotiation
article thumbnail

LEAN Job Order Contracting

Job Order Contracting

Effectively manage concept development, requests for proposals, joint site visits, proposal reviews and negotiations, approvals/notices to proceed, regular inspections, checklists, close-outs, warranties, and more! U nleash the power of BIM and full Document Management. BIM management. The “Main menu toolbar”.

Contract 100
article thumbnail

BIM 101 for Andrew Hayward; Balfour Beatty plc: Head of Ethics, Risk and Assurance

DebunkTheBIM

On Sunday, August the 25 th this year, within this blog I published the third instalment of the story I like to refer to as the ‘HK MTR BIM experiment’. An external consultant was hired to assist with the implementation of this non-complying BIM and engaged over a lengthy period of time. · Missed and/or ignored. ·

BIM 48
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 54 36 Building Information Modeling Exhibit. 33 42 16 Stormwater Force Main Piping.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 54 36 Building Information Modeling Exhibit. 33 42 16 Stormwater Force Main Piping.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

2010, Model Energy Code, ASHRAE Standard 135-­?2008, Demonstrate the ability to work with Facilities team to negotiate rates and discounts. o Negotiate for services, resources, information and commitments. It arranges the system into: Core Competency Areas, Core Competencies and Performances. 2010, ASHRAE 62.1-­?2010,