Remove Blog Remove Inspections Remove Roads Remove Transportation
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

What Are The Popular Heavy Equipment Used On Most Jobs

Construction Marketing

If the excavator is being used heavily, these parts, including other supporting parts, such as the bucket, attachments, and heavy equipment rubber tracks , should be inspected daily and immediately changed when already showing signs of wear. These trucks are mostly used in the transportation of large volumes of debris. Conclusion.

Equipment 156
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How To Choose The Right Crane For Your Project

Construction Marketing

Cranes are essential to any major construction project, providing safe and efficient on-site transportation of heavy materials. If the access roads going to the site are too narrow or filled with tight turns, a truck crane or hydraulic crane may not be able to pass through. Check the accessibility and conditions of the worksite.

Budgeting 156
article thumbnail

Derailment inquiry exposes risk management shortfalls

Construction Law

Other inquiries are being made jointly by Police Scotland, British Transport Police and railway regulator the Office of Rail and Road. So part of the drainage system had not been inspected at all since 2012.

Risk 52
article thumbnail

State of the Construction Industry: August Roundup

Viewpoint Construction Technology

A bipartisan group of senators introduced a bill called the Innovative Materials for America’s Growth and Infrastructure Newly Expanded (IMAGINE) Act, which could increase investment in new materials for infrastructure projects like roads and water systems. Need a Quick Inspection of a 58-Story Tower? Send a Drone.

article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Depending on how big or complicated the pour is, the inspection may just take few minutes or it could take hours. Only when the formwork has been approved, may the pour take place. He is the founder of The Constructor and works in a reputed construction company.

Concrete 235
article thumbnail

Subways in America

The Constructor

Posted in Category: Videos Leave a Reply Click here to cancel reply Your name (Required) Your e-mail (Your email wont be published) (Required) Your website Notify me of followup comments via e-mail About The Author This blog is authored and maintained by Gopal Mishra. Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

America 203