The digital black hole impacting the construction industry

Fieldwire

It’s a widespread problem that attributes to some of the inefficiencies that cause large projects to run on average 20% longer to finish than scheduled and up to 80% over budget. Labor efficiency is the basis of most tender estimates, as well as the yardstick by which performance is measured and monitored.

article thumbnail

Using Business Intelligence to Gain a Competitive Edge

Viewpoint Construction Technology

When profit margins are thin, it doesn’t take much to wipe out a project’s financial benefits. Insights from all this information could increase profit and productivity and reduce time, errors, and material waste. Insights from all this information could increase profit and productivity and reduce time, errors, and material waste.

Risk 177
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Lean Construction History

Job Order Contracting

The cost of a JOC project, also referred to as a Job Order (JO) or Task Order (TO) be determined by creating a detailed line item unit price estimate for the associated Statement of Work (SOW) provided by the Owner. The total of the estimate is then multiplied by a coefficient. via Four BT, LLC – WWW.4BT.US.

Contract 100
article thumbnail

How to Select a JOC Unit Price Book

Building Information Management

How to Select a JOC Unit Price Book– WHITE PAPER. The cost database and associated projects and estimates can only be cost effectively created, stored, maintained, and used within a common data environment and JOC-specific technology. INTRODUCTION. Is the size of the UPB manageable? Are demolition line items present ?

article thumbnail

How to Select a JOC Unit Price Book

Building Information Management

How to Select a JOC Unit Price Book– WHITE PAPER. The cost database and associated projects and estimates can only be cost effectively created, stored, maintained, and used within a common data environment and JOC-specific technology. INTRODUCTION. Is the size of the UPB manageable? Are demolition line items present ?

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Office of Management and Budget (OMB). Office of Management and Budget. The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. percent less than the government’s projected estimated costs. INTERIM EDITION.