Remove CAD Remove Change Orders Remove Drafting Remove Estimating
article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

FingerCAD : FingerCAD is a CAD application for technical drawing with fingers assisted by computer. Besides, this application includes concrete and excavation formulas that help in estimating the concrete and bricks required. Through this application, the final design is saved and can be sent via e-mail or printed.

iPad 45
article thumbnail

A position is vacant for Senior Engineer in Houston, Texas

Construction Cost Estimating

Accomplishes work by applying Bechtel Standard Application Programs (BSAPs) and proper 2-D and 3-D computer aided design and computer aided engineering ( CAD and CAE) tools. Drafts letters independently to vendors and clients. Evaluates bid analyses and makes recommendation. Evaluates and verifies work of subordinate engineers.

Houston 40
article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Sage Estimating Sage Estimating can significantly accelerate the estimating process for several construction firms. As soon as the project is procured, estimate details flow automatically into Sage business management software, removing unnecessary tasks and data entry errors.

Bidding 40