Remove CAD Remove Change Orders Remove Drafting Remove Materials
article thumbnail

A position is vacant for Senior Engineer in Houston, Texas

Construction Cost Estimating

Accomplish work for customary engineering practice but may involve complicated features like settling conflicting design requirements, inadequacy of conventional materials and/or difficult coordination requirements. Drafts letters independently to vendors and clients. Evaluates bid analyses and makes recommendation.

Houston 40
article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

The size of the model handled by GoBIM depends on three factors- number of parameters, number of triangles and number of materials. FingerCAD : FingerCAD is a CAD application for technical drawing with fingers assisted by computer. It also calculates the cost of waste materials, concrete and rebar.

iPad 45
article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Sage Estimating also facilitates forecasting the labor, raw material and other overhead costs so that the contractors can arrange & deliver correct bids. Download CostX CostX can instantly capture exact measurements from scanned, PDF and CAD drawings together with formation of automatic BIM quantities from 3D/BIM models.

Bidding 40