Remove CAD Remove Change Orders Remove Estimating Remove Schedule
article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

FingerCAD : FingerCAD is a CAD application for technical drawing with fingers assisted by computer. Besides, this application includes concrete and excavation formulas that help in estimating the concrete and bricks required. Through this application, the final design is saved and can be sent via e-mail or printed.

iPad 45
article thumbnail

A position is vacant for Senior Engineer in Houston, Texas

Construction Cost Estimating

Job Role: Plans, schedules, manages, and organizes complete level of engineering work for a global business unit generally in one discipline in a project or staff group. Accomplishes work by applying Bechtel Standard Application Programs (BSAPs) and proper 2-D and 3-D computer aided design and computer aided engineering ( CAD and CAE) tools.

Houston 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Some Best Construction Apps In Recent Times

Construction Cost Estimating

SmartBidNet will come up with available information to build bid projects easily and complete it in scheduled time. The app facilitates the users to create designs with CAD at the jobsite or at your preferred location. It can also be used to estimate waste materials, concrete and rebar costs. It can also be printed.

article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Sage Estimating Sage Estimating can significantly accelerate the estimating process for several construction firms. As soon as the project is procured, estimate details flow automatically into Sage business management software, removing unnecessary tasks and data entry errors.

Bidding 40