Remove CAD Remove Comparison Remove Drafting Remove Schedule
article thumbnail

Construction Scheduling Techniques

Construction Cost Estimating

Construction cost estimator should create project scheduling to assign dates to project activities and to match the resources of materials, equipment and labour for organized project procedure. Proper scheduling eliminates problems that can arise due to production limitation.

article thumbnail

SHOP DRAWING creates maximum benefits for construction companies

Construction Cost Estimating

The shop drawing is a drawing or collection of set of drawings, diagrams, illustrations, schedules, and other data or information specifically generated or assembled by the contractor, supplier, manufacturer, subcontractor, or fabricator to demonstrate some portion of the work for the approval of architect or engineer.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Schedule maintenance on these doors so that it does not interfere with loading dock operations. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Review manufacturer’s instructions.