Remove CAD Remove Green Remove Insurance Remove Work in Progress
article thumbnail

Essential BIM Terminology

Viewpoint Construction Technology

Level 0 : Level 0 entails basically no collaboration, and only 2D CAD drafting is used. Level 1 : Level 1 BIM is a combination of 3D CAD and 2D for drafting. It focuses on professional indemnity insurance issues. The RAG Report, or simply referred to as RAG, indicates the status of an action in either red, amber, or green.

BIM 189