Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

Educational and training programs must focus upon asset life-cycle management and modeling. Overall focus must shift from first-cost mentality to life-cycle/total-cost-of-ownership. How many contractor estimates have been issued? What is the average time from RFQ to contractor estimate?

article thumbnail

Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

For example, estimating a job requires knowledge about about the impact that AE, context, and execution scope have on each unit, assembly, and system level cost. A “FACEBOOK for Facilities Construction and Life-cycle Operations” is on the horizon. A comparison of IPD/JOC and tradition delivery methods is shown below.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

20+ Fresh Releases for Autodesk Construction Cloud

Autodesk Construction Cloud

By turning on new columns, users can now easily see the original SOV, change orders, and revised SOV to have a granular view of costs. Cost Management | Display Associated xCO Number in all xCO Table Views* Within all table views within the Change Order tool, users now have the option to display associated xCO numbers (e.g.,

Autodesk 111
article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

Unproductive ad hoc processes traditionally associated with the design, construction and management of the built environment are being replaced by robust life-cycle management and efficient project delivery methods. management of the built environment are being replaced by robust life-cycle management and efficient project.

BIM 40
article thumbnail

Collaborative, Efficient Construction Delivery Methods – The Real Obstacle to BIM

Building Information Management

The Architecture, Engineering, Construction, Operations, Owner (AECOO) sector must engage in collaborative construction delivery methods in over achieve any measurable performance improvement in the life-cycle management of the built environment. Building Information Management, Model and Modeling.

BIM 58
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Copies of the subcontractor proposals are to be a part of the Task Order submittal, and shall be included as backup. Preliminary plans and specifications are generated.