Remove Change Orders Remove CSI Remove Drawings Remove Visualization
article thumbnail

Integrated project delivery method

Job Order Contracting

A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. . At detailed line item level, an example being the CSI Masterformat data architecture. They are aware of the traditional waste and productivity issues and are beginning to demand change.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 63 36 Field Order Form. 01 33 29.05

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 63 36 Field Order Form. 01 33 29.05