iPhone and iPad Applications Best Suited for Construction Professionals
Construction Cost Estimating
JANUARY 14, 2014
FingerCAD : FingerCAD is a CAD application for technical drawing with fingers assisted by computer. Besides, this application includes concrete and excavation formulas that help in estimating the concrete and bricks required. Through this application, the final design is saved and can be sent via e-mail or printed.
Let's personalize your content