Remove Change Orders Remove Foundation Remove Life Cycle Remove Project Management
article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

Educational and training programs must focus upon asset life-cycle management and modeling. Overall focus must shift from first-cost mentality to life-cycle/total-cost-of-ownership. Faster project delivery, financial transparency, and less required project management are additional benefits provided by JOC.

article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

I initially started at North Point, managing projects, then moved to Senior Project Manager and ultimately the Director of Design and Construction. I also oversee the development life cycle, starting with due diligence, all the way up through the end of construction and through the warranty period.

Design 80
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

BIM Collaboration – Fact or Fiction?

Building Information Management

The design-bid-build construction delivery method and associated practices such of awarding contracts to the lowest bidder do little more than a fuel to the fires of waste, protracted project timelines, change orders, and legal disputes. 1-Architerture, Engineering, Construction, Owners, Operations.

BIM 55
article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. It is time to rethink the contractual context for efficient construction project delivery. BIM/ BIM EXECUTION PLAN.

BIM 40
article thumbnail

The Ultimate Guide to Choosing the Best Project Delivery Method

Autodesk Construction Cloud

While a project’s ultimate goal is a successful completion, the steps it takes to get there are critical to profits and project’s life cycle. That’s why choosing the right project delivery method is an important first step before construction begins. Factors to Consider Before Selecting a Project Delivery Method.

Risk 52
article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

BIM (Building Information Modeling), cloud computing, and social media are disruptive technologies which are altering the basic foundations of the AECOO sector (Architecture, Engineering, Construction, Owners, and Operations). altering the basic foundations of the AECOO sector (Architecture, Engineering, Construction, Owners, and.

BIM 40
article thumbnail

Integrated Project Delivery – IPD, Job Order Contracting – JOC, BIM, and Efficient Project Delivery

Building Information Management

In summary, IPD advocates pulling together the owner, contractor, designer, and others to achieve higher project results, which in turn increases the overall value to the owner. Accordingly, the risk profile and allocation change significantly from other traditionaldelivery methods. It is intended for large-size projects.