Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

A “FACEBOOK for Facilities Construction and Life-cycle Operations” is on the horizon. BIM definition, from NIBS, and I paraphrase, is the life-cycle management of facilities supported by digital technology. Higher Level FM Processes – LEAN, TCO / Total Cost of Ownership / Life-cycle Management.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

Educational and training programs must focus upon asset life-cycle management and modeling. Overall focus must shift from first-cost mentality to life-cycle/total-cost-of-ownership. The importance of Job Order Contract performance measurement cannot be understated. What is the total value of change orders?

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM Collaboration – Fact or Fiction?

Building Information Management

The design-bid-build construction delivery method and associated practices such of awarding contracts to the lowest bidder do little more than a fuel to the fires of waste, protracted project timelines, change orders, and legal disputes. 1-Architerture, Engineering, Construction, Owners, Operations.

BIM 55
article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. BIM (Building Information Modeling) is the life-cycle management of the built environment supported by digital technology. As such it serves as a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life cycle from inception onwards.

BIM 40
article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

BIM (Building Information Modeling), cloud computing, and social media are disruptive technologies which are altering the basic foundations of the AECOO sector (Architecture, Engineering, Construction, Owners, and Operations). altering the basic foundations of the AECOO sector (Architecture, Engineering, Construction, Owners, and.

BIM 40
article thumbnail

Integrated Project Delivery – IPD, Job Order Contracting – JOC, BIM, and Efficient Project Delivery

Building Information Management

Project delivery methods set the tone and largely dictate the relative success of any facility construction, renovation, repair, or sustainability project. It promotes collaboration and partnership; it is about integrating design excellence with a constructor’s expertise during the conceptual stage of a project life cycle.

article thumbnail

What Is a Digital Twin? 

Autodesk Construction Cloud

This connected system can improve the asset’s entire life cycle from the pre-project stage to the end-of-life stage. submittals, change orders, RFIs, etc.). Lower costs: Digital twins can reduce life cycle costs, which can help improve the project and asset performance.

BIM 98