Remove Commissioning Remove Debt Remove Design Remove Railroad
article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

Last year, a State Budget Crisis Task Force headed by former Fed Chairman Paul Volcker estimated California’s long-term debt at a staggering $370 billion. that are LEED-certified (Leadership in Energy and Environmental Design). Barstow is where an eclectic mix of railroad, military, high technology, and mining employers have located.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

TVA Economic Development Loan Fund: A multimillion-dollar revolving loan program designed to stimulate investment and job creation in the TVA region. 573), was enacted in 1987 to stimulate business and industrial growth in designated areas of the state that are considered economically depressed.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. Applicants must meet the same qualification criteria as Advantage Arkansas and must be approved by the Arkansas Economic Development Commission.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). Requirements.