Remove Commissioning Remove Drafting Remove Permits Remove Railroad
article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

In comparison, railroads are in a much better position regarding infrastructure, equipment and personnel. Three Class I railroads (Norfolk Southern, Canadian Northern and the CSX) serve Decatur and are directly interconnected through a privately owned intermodal ramp as part of the Midwest Inland Port. Subsequently, the U.S.

article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

Jerry Brown fired the two state regulators who had overseen a 70 percent decline in state drilling permits since 2008, a notable turnaround for a state leader who in his first stint as governor in the 1970s pioneered many of California’s landmark environmental protection statutes. Last year, CA Gov. Barstow Casino & Resort Project.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

The Port currently has service by two Class I railroads, Norfolk Southern and CSX—both offer double-stack service to critical manufacturing and population centers. Rendering of the Bayonne Bridge, as it will look after it is raised to permit passage of Post-Panamax container vessels. THE BAYONNE BRIDGE IS RISING. Photo: NJ.com.).

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Appalachian Regional Commission and Delta Regional Authority Grants: Federal-state partnerships that work with the people of 37 Appalachian counties in Alabama and the Mississippi Delta region’s twenty Alabama counties to create opportunities for self-sustaining economic development and improved quality of life.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 01 41 26 Permit Requirements. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning. Foundation Commissioning. Basement Construction Commissioning. 01 91 19 Facility Shell Commissioning.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 01 41 26 Permit Requirements. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning. Foundation Commissioning. Basement Construction Commissioning. 01 91 19 Facility Shell Commissioning.