Remove Concrete Remove Drafting Remove Drawings Remove Subcontracting
article thumbnail

Behind the Build: Interview with Matthew Keck, BIM Manager at Metromont 

Autodesk Construction Cloud

Tell me a little bit about Metroment and what you specialize in Metromont specializes in producing precast concrete products designed, engineered, and produced here in Greenville, SC and surrounding areas. Here in Greenville, we subcontract the erection, but we oversee it. Let’s dive in. We put them together with instructions.

BIM 98
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. Existing Concrete Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. Existing Concrete Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Requirements.