Remove Conference Remove Design Remove Drafting Remove Railroad
article thumbnail

Global Growth Surge in Southwest Louisiana

Business Facilities

While standing next to each other during a press conference, Louisiana Governor John Bel Edwards and Lotte CEO Soon Hyo “Steve” Chung told a group of onlookers that the company would establish its headquarters in Lake Charles (relocating from Houston). Mary (PWSM) are shallow draft ports.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

Launched by the Shale Gas Innovation and Commercialization Center (SGICC), the initiative is designed to harness entrepreneurial innovation to maximize the economic return from the Marcellus and Utica shale formations. Already the nation’s No. 2 crude oil producer and No. So evolved is Louisiana’s pipeline infrastructure that the state’s No.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

TVA Economic Development Loan Fund: A multimillion-dollar revolving loan program designed to stimulate investment and job creation in the TVA region. 573), was enacted in 1987 to stimulate business and industrial growth in designated areas of the state that are considered economically depressed. In December 2002, the former U.S.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.