Remove Conference Remove Education Remove Foundation Remove Railroad
article thumbnail

State Focus: Arkansas – Easy To Reach, Easy To Grow

Buisness Facilities Contributed Content

1,677 miles of Class 1 railroads. Arkansas’s railroad infrastructure includes three Class I systems: Union Pacific, BNSF Railway, and Kansas City Southern Railway. In addition, the state has 22 smaller railroads operating over its more than 2,700 miles of track. Department of Education. 16,416 miles of state and U.S.

article thumbnail

Location Focus: Illinois – Trying to Make Headway in Every Way

Business Facilities

Anchored by the privately owned and operated Decatur Rail and Intermodal Logistics Facility located on more than 250 acres, the Midwest Inland Port provides direct access to three Class I railroads (Norfolk Southern, Canadian National and the CSX). Existing Foreign Trade Zone and U.S. That number reflects a 6.7 percent in 2013, down from 7.7

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

states with service to all six Class I railroads, and offers more than 7,300 miles of oil pipeline and 11,200 miles of gas pipeline. The foundation work for the Highland turbines started last fall and should be done by the end of the year, with the turbines and the more than 650 blades set to go up by the end of 2015. O’Brien said.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The allocation to each Public University which makes application shall be based on each Public University’s federally financed research and development expenditures as reported by the National Science Foundation. The requirements are: Program must have written approval from the Alabama Department of Education. The Research Program.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

BROWNFIELD DEVELOPMENT TAX ABATEMENTS: Gives cities and counties the ability to abate the following: Non-educational city and county sales & use taxes; Non-educational state, city and county property taxes—up to 20 years; Mortgage and recording taxes. The educational facility will also serve as fiscal agent for the project.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 82 13 Foundation Performance Requirements. Foundation Commissioning. 03 71 00 Mass Concrete for Raft Foundations. 06 14 00 Treated Wood Foundations. Modifications. 00 91 00 Precontract Revisions. 00 91 13 Addenda. 00 91 16 Bid Revisions. 00 91 19 Proposal Revisions. 00 93 00 Record Clarifications and Proposals.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 82 13 Foundation Performance Requirements. Foundation Commissioning. 03 71 00 Mass Concrete for Raft Foundations. 06 14 00 Treated Wood Foundations. Modifications. 00 91 00 Precontract Revisions. 00 91 13 Addenda. 00 91 16 Bid Revisions. 00 91 19 Proposal Revisions. 00 93 00 Record Clarifications and Proposals.